1) Which is legislation related to the notching and drilling of joists. a) Building Regulations Part N b) Building Regulations Part A c) Building Regulations Part D d) Building Regulations Part B 2) Which are hazards faced when lifting floor in an occupied house? a) Stopping nails/screws penetrating boards b) Falling through ice/blocking apple routes c) Spiders and bugs under the floorboards d) Falling through holes/blocking access routes 3) To maintain good working relationships we should; a) Have no site meetings, bad communication b) Have regular site meetings, stop all communication c) Have regular site meetings. good communication d) Let disputes arise and ensure to escalate disagreements 4) What is shown in the picture? a) Soft marsh floor b) Solid/ concrete floor c) Chipboard d) Wooden floorboards 5) What is shown in the picture? a) Soft marsh floor b) Solid/ concrete floor c) Chipboard d) Wooden floorboards 6) What is the name of the document is shown in the picture? a) Work schedule b) Schematic c) Scale drawing d) Site plan e) Manufacturers instructions 7) What is the name of the document is shown in the picture? a) Work schedule b) Schematic c) Scale drawing d) Site plan e) Manufacturers instructions 8) What is the name of the document is shown in the picture? a) Work schedule b) Schematic c) Scale drawing d) Site plan e) Manufacturers instructions 9) What is the name of the document is shown in the picture? a) Work schedule b) Schematic c) Scale drawing d) Site plan e) Manufacturers instructions 10) What is the name of the document is shown in the picture? a) Work schedule b) Schematic c) Scale drawing d) Site plan e) Manufacturers instructions 11) What action should we take before starting work? a) Lay down on the floor b) Lay down dust sheets c) Sweep the area d) Move valuables out the way 12) What action should we take before starting work? a) Lay down in the fridge b) Lay down dust particles c) Sweep the area d) Ask for valuables to be moved out the way 13) What action should we take before starting work? a) Leave tools on the floor b) Lay down dust particles c) Record any existing damage d) Measure the rooms 14) What is the 1st stage of lifting floorboards a) Check for pipes & cables b) Cut tongue and groove joint c) Lift the board d) Remove covering (carpets) 15) What is the last stage of lifting floorboards? a) Remove covering (roll back carpets) b) Barrier off exposed open areas c) Check for pipes and cables d) Remove the board 16) What is the final stage of constructing a building? a) 2nd fixing b) Installing roof structure c) Testing and commissioning systems d) Laying building foundations 17) Before we can install the roof structure, when constructing a building we must? a) Install kitchen units b) Test & commission systems c) Brick walls to roof line d) Complete all 1st fix 18) Before lifting wooden floorboards to expose the joists, we should do what first? a) Cut tongue and groove, then check for pipes and cables b) Cross-cut the board, then cut tongue and groove joint c) Cut tongue and groove joint, then cross-cut the board d) De-nail the boards and joists, then roll back carpets 19) When a customers valuable property needs to be moved you should always? a) Do it safely with manual handling b) Assess the load first c) Ask the customer to have the property moved d) Take photos and record damage before moving anything 20) When lifting flooring in an occupied dwelling you should be cautious of what hazard? a) Hamsters in the floorboards b) Dead bodies and diseases c) Nails,screws or blades penetrating pipes and cables underneath d) Spontaneous combustion 21) What colour is the line conductor? a) Blue b) Black c) Brown d) Yellow & green 22) What colour is the neutral conductor? a) Brown b) Red c) Blue d) Yellow & green 23) What colour is the CPC (circuit protective conductor)? a) Brown b) Yellow & green c) Red d) Grey 24) What does CPC stand for? a) Circuit plug conductor b) Circuit protective clamp c) Circle protective conductor d) Circuit protective conductor

Unit 104 revision quiz

Rangliste

Åbn boksen er en åben skabelon. Det genererer ikke resultater for en rangliste.

Visuel stil

Indstillinger

Skift skabelon

Gendan automatisk gemt: ?