1) Which document indicates when materials should be ordered for a construction project? a) Time sheet b) Daily work sheert c) Programme of works d) Method statement 2) On a working drawing with a scale of 1:200, what length would a 10mm line represent? a) 2mm b) 20mm c) 200mm d) 2000mm 3) What does this symbol represent? a) Sawn wood b) Planed wood c) Insulation d) Concrete 4) What does this symbol represent? a) WC b) Sink c) Door d) Window 5) What does this hatching represent? a) Concrete b) Brickwork c) Insulation d) Stone 6) What does this symbol represent? a) Sink b) Window c) Door d) Wardrobe 7) What does this symbol represent? a) Window b) Door c) Bath d) Kitchen unit 8) What does this symbol represent? a) Brickwork b) Subsoil c) Timber d) Blockwork 9) Which of the following is the name given to a fixed level determined on site? a) Building line b) Frontage line c) Temporary benchmark d) Ordinance survey benchmark 10) What method is used to check for square when setting out a building? a) Use a laser level b) Measure the diagonals c) Use a site datum d) Measuring for parallel
0%
Unit 202 a
共有
Shough
さんの投稿です
FE
Construction
コンテンツの編集
印刷
埋め込み
もっと見る
割り当て
リーダーボード
もっと表示する
表示を少なくする
このリーダーボードは現在非公開です。公開するには
共有
をクリックしてください。
このリーダーボードは、リソースの所有者によって無効にされています。
このリーダーボードは、あなたのオプションがリソースオーナーと異なるため、無効になっています。
オプションを元に戻す
クイズ
は自由形式のテンプレートです。リーダーボード用のスコアは生成されません。
ログインが必要です
表示スタイル
フォント
サブスクリプションが必要です
オプション
テンプレートを切り替える
すべてを表示
アクティビティを再生すると、より多くのフォーマットが表示されます。
オープン結果
リンクをコピー
QRコード
削除
自動保存:
を復元しますか?