Rollback Plan - Rollback Plan: Develop a rollback plan for reverting changes if issues arise. Include specific steps, tools required, and designated rollback points. Test the rollback plan to ensure its effectiveness before implementing changes. , Sandbox Testing - Sandbox Testing: Use a sandbox environment to test changes in isolation. Mimic production settings to identify potential issues without impacting live systems. , Responsible Staff Member - Responsible Staff Member: Assign a dedicated staff member to oversee the change. Ensure this person coordinates testing, approvals, and implementation. , Request Forms - Request Forms: Use standardized forms to initiate change requests. Include fields for purpose, scope, affected systems, and risk analysis. , Purpose of the Change - Purpose of the Change: Clearly define why the change is being made. Align the purpose with organizational goals or problem resolution. , Scope of the Change - Scope of the Change: Specify what the change entails and what it will not affect. Document any dependencies or constraints. , Date and Time of the Change - Date and Time of the Change: Schedule changes during low-impact periods (e.g., off-peak hours). Allow time for testing and rollback if needed. , Affected Systems/Impact - Affected Systems/Impact: Identify systems, users, and processes impacted by the change. Communicate potential disruptions to stakeholders in advance. , Risk Analysis - Risk Analysis: Assess risks associated with the change, including technical, operational, and business impacts. Categorize the risk level (e.g., Low, Medium, High) to determine mitigation steps. , Risk Level - Risk Level: Low: Minimal impact, easily reversible. Medium: Moderate impact, requires more testing and monitoring. Medium: Moderate impact, requires more testing and monitoring.High: Significant impact, requires extensive testing, approvals, and a detailed rollback plan. , Change Board Approvals - Change Board Approvals: Present the change request to a Change Advisory Board (CAB) for review. Ensure the board evaluates the change based on risk, impact, and alignment with organizational objectives. Document the approval or rejection decision. , End-User Acceptance - End-User Acceptance: Involve end-users in testing to confirm functionality and usability. Gather feedback to identify and address potential issues before deployment. ,
0%
a+1102 4.2 Explain basic change-management best practices
공유
만든이
Thedrizzzle86
Higher Education
Computing
information technology
콘텐츠 편집
퍼가기
더보기
할당
순위표
더 보기
접기
이 순위표는 현재 비공개입니다.
공유
를 클릭하여 공개할 수 있습니다.
자료 소유자가 이 순위표를 비활성화했습니다.
옵션이 자료 소유자와 다르기 때문에 이 순위표가 비활성화됩니다.
옵션 되돌리기
매치업
(은)는 개방형 템플릿입니다. 순위표에 올라가는 점수를 산출하지 않습니다.
로그인이 필요합니다
비주얼 스타일
글꼴
구독 필요
옵션
템플릿 전환하기
모두 표시
액티비티를 플레이할 때 더 많은 포맷이 나타납니다.
결과 열기
링크 복사
QR 코드
삭제
자동 저장된
게임을 복구할까요?