1) Which document indicates when materials should be ordered for a construction project? a) Time sheet b) Daily work sheert c) Programme of works d) Method statement 2) On a working drawing with a scale of 1:200, what length would a 10mm line represent? a) 2mm b) 20mm c) 200mm d) 2000mm 3) What does this symbol represent? a) Sawn wood b) Planed wood c) Insulation d) Concrete 4) What does this symbol represent? a) WC b) Sink c) Door d) Window 5) What does this hatching represent? a) Concrete b) Brickwork c) Insulation d) Stone 6) What does this symbol represent? a) Sink b) Window c) Door d) Wardrobe 7) What does this symbol represent? a) Window b) Door c) Bath d) Kitchen unit 8) What does this symbol represent? a) Brickwork b) Subsoil c) Timber d) Blockwork 9) Which of the following is the name given to a fixed level determined on site? a) Building line b) Frontage line c) Temporary benchmark d) Ordinance survey benchmark 10) What method is used to check for square when setting out a building? a) Use a laser level b) Measure the diagonals c) Use a site datum d) Measuring for parallel
0%
Unit 202 a
共享
由
Shough
FE
Construction
编辑内容
打印
嵌入
更多
作业
排行榜
显示更多
显示更少
此排行榜当前是私人享有。单击
,共享
使其公开。
资源所有者已禁用此排行榜。
此排行榜被禁用,因为您的选择与资源所有者不同。
还原选项
随堂测验
是一个开放式模板。它不会为排行榜生成分数。
需要登录
视觉风格
字体
需要订阅
选项
切换模板
显示所有
播放活动时将显示更多格式。
打开成绩
复制链接
QR 代码
删除
恢复自动保存:
?