Rollback Plan - Rollback Plan: Develop a rollback plan for reverting changes if issues arise. Include specific steps, tools required, and designated rollback points. Test the rollback plan to ensure its effectiveness before implementing changes. , Sandbox Testing - Sandbox Testing: Use a sandbox environment to test changes in isolation. Mimic production settings to identify potential issues without impacting live systems. , Responsible Staff Member - Responsible Staff Member: Assign a dedicated staff member to oversee the change. Ensure this person coordinates testing, approvals, and implementation. , Request Forms - Request Forms: Use standardized forms to initiate change requests. Include fields for purpose, scope, affected systems, and risk analysis. , Purpose of the Change - Purpose of the Change: Clearly define why the change is being made. Align the purpose with organizational goals or problem resolution. , Scope of the Change - Scope of the Change: Specify what the change entails and what it will not affect. Document any dependencies or constraints. , Date and Time of the Change - Date and Time of the Change: Schedule changes during low-impact periods (e.g., off-peak hours). Allow time for testing and rollback if needed. , Affected Systems/Impact - Affected Systems/Impact: Identify systems, users, and processes impacted by the change. Communicate potential disruptions to stakeholders in advance. , Risk Analysis - Risk Analysis: Assess risks associated with the change, including technical, operational, and business impacts. Categorize the risk level (e.g., Low, Medium, High) to determine mitigation steps. , Risk Level - Risk Level: Low: Minimal impact, easily reversible. Medium: Moderate impact, requires more testing and monitoring. Medium: Moderate impact, requires more testing and monitoring.High: Significant impact, requires extensive testing, approvals, and a detailed rollback plan. , Change Board Approvals - Change Board Approvals: Present the change request to a Change Advisory Board (CAB) for review. Ensure the board evaluates the change based on risk, impact, and alignment with organizational objectives. Document the approval or rejection decision. , End-User Acceptance - End-User Acceptance: Involve end-users in testing to confirm functionality and usability. Gather feedback to identify and address potential issues before deployment. ,
0%
a+1102 4.2 Explain basic change-management best practices
共用
由
Thedrizzzle86
Higher Education
Computing
information technology
編輯內容
嵌入
更多
作業
排行榜
顯示更多
顯示更少
此排行榜當前是私有的。單擊
共用
使其公開。
資源擁有者已禁用此排行榜。
此排行榜被禁用,因為您的選項與資源擁有者不同。
還原選項
匹配遊戲
是一個開放式範本。它不會為排行榜生成分數。
需要登錄
視覺風格
字體
需要訂閱
選項
切換範本
顯示所有
播放活動時將顯示更多格式。
打開結果
複製連結
QR 代碼
刪除
恢復自動保存:
?