1) Which document indicates when materials should be ordered for a construction project? a) Time sheet b) Daily work sheert c) Programme of works d) Method statement 2) On a working drawing with a scale of 1:200, what length would a 10mm line represent? a) 2mm b) 20mm c) 200mm d) 2000mm 3) What does this symbol represent? a) Sawn wood b) Planed wood c) Insulation d) Concrete 4) What does this symbol represent? a) WC b) Sink c) Door d) Window 5) What does this hatching represent? a) Concrete b) Brickwork c) Insulation d) Stone 6) What does this symbol represent? a) Sink b) Window c) Door d) Wardrobe 7) What does this symbol represent? a) Window b) Door c) Bath d) Kitchen unit 8) What does this symbol represent? a) Brickwork b) Subsoil c) Timber d) Blockwork 9) Which of the following is the name given to a fixed level determined on site? a) Building line b) Frontage line c) Temporary benchmark d) Ordinance survey benchmark 10) What method is used to check for square when setting out a building? a) Use a laser level b) Measure the diagonals c) Use a site datum d) Measuring for parallel
0%
Unit 202 a
שתף
על ידי
Shough
FE
Construction
עריכת תוכן
הדפסה
הטבעה
עוד
הקצאות
לוח תוצאות מובילות
הצג עוד
הצג פחות
לוח התוצאות הזה הוא כרגע פרטי. לחץ
שתף
כדי להפוך אותו לציבורי.
לוח תוצאות זה הפך ללא זמין על-ידי בעל המשאב.
לוח תוצאות זה אינו זמין מכיוון שהאפשרויות שלך שונות מאשר של בעל המשאב.
אפשרויות חזרה
חידון
היא תבנית פתוחה. זה לא יוצר ציונים עבור לוח התוצאות.
נדרשת כניסה
סגנון חזותי
גופנים
נדרש מנוי
אפשרויות
החלף תבנית
הצג הכל
תבניות נוספות יופיעו במהלך המשחק.
תוצאות פתוחות
העתק קישור
קוד QR
מחיקה
האם לשחזר את הנתונים שנשמרו באופן אוטומטי:
?