Rollback Plan - Rollback Plan: Develop a rollback plan for reverting changes if issues arise. Include specific steps, tools required, and designated rollback points. Test the rollback plan to ensure its effectiveness before implementing changes. , Sandbox Testing - Sandbox Testing: Use a sandbox environment to test changes in isolation. Mimic production settings to identify potential issues without impacting live systems. , Responsible Staff Member - Responsible Staff Member: Assign a dedicated staff member to oversee the change. Ensure this person coordinates testing, approvals, and implementation. , Request Forms - Request Forms: Use standardized forms to initiate change requests. Include fields for purpose, scope, affected systems, and risk analysis. , Purpose of the Change - Purpose of the Change: Clearly define why the change is being made. Align the purpose with organizational goals or problem resolution. , Scope of the Change - Scope of the Change: Specify what the change entails and what it will not affect. Document any dependencies or constraints. , Date and Time of the Change - Date and Time of the Change: Schedule changes during low-impact periods (e.g., off-peak hours). Allow time for testing and rollback if needed. , Affected Systems/Impact - Affected Systems/Impact: Identify systems, users, and processes impacted by the change. Communicate potential disruptions to stakeholders in advance. , Risk Analysis - Risk Analysis: Assess risks associated with the change, including technical, operational, and business impacts. Categorize the risk level (e.g., Low, Medium, High) to determine mitigation steps. , Risk Level - Risk Level: Low: Minimal impact, easily reversible. Medium: Moderate impact, requires more testing and monitoring. Medium: Moderate impact, requires more testing and monitoring.High: Significant impact, requires extensive testing, approvals, and a detailed rollback plan. , Change Board Approvals - Change Board Approvals: Present the change request to a Change Advisory Board (CAB) for review. Ensure the board evaluates the change based on risk, impact, and alignment with organizational objectives. Document the approval or rejection decision. , End-User Acceptance - End-User Acceptance: Involve end-users in testing to confirm functionality and usability. Gather feedback to identify and address potential issues before deployment. ,
0%
a+1102 4.2 Explain basic change-management best practices
Delen
door
Thedrizzzle86
Higher Education
Computing
information technology
Inhoud Bewerken
Embedden
Meer
Toewijzingen
Scorebord
Meer weergeven
Minder weergeven
Dit scoreboard is momenteel privé. Klik op
Delen
om het publiek te maken.
Dit scoreboard is uitgeschakeld door de eigenaar.
Dit scoreboard is uitgeschakeld omdat uw opties anders zijn dan die van de eigenaar.
Opties Herstellen
Verbinden
is een open template. Het genereert geen scores voor een scoreboard.
Inloggen vereist
Visuele stijl
Lettertypen
Abonnement vereist
Opties
Template wisselen
Alles weergeven
Er zullen meer templates verschijnen terwijl je de activiteit gebruikt.
Open resultaten
Kopieer link
QR-code
Verwijderen
Automatisch opgeslagen activiteit "
" herstellen?