The vent pipe, This allows air to enter the system to operate at atmospheric pressure , must comply with part h and bs en 12056, a long radius bend or two 45's. This allows effluent to maintain its velocity, To overcome crossflow a parallel junction may be used. This allows for a connection to be made under the 200mm restriction., The parallel junction is made of 50mm waste pipe and includes rodding access and a strapped boss connection, vent terminal (bird cage) to stop debris entering the stack, pipe size 75mm-100mm, max length 3m, gradient 18-90mm, pipe size 32mm, max length 1.7m, gradient 18-22mm, pipe size 40mm, max length 3m, gradient 18-90mm, wc trap seal depth 50mm, basin trap seal depth 75mm, bath trap seal depth 50mm pipe size 40mm, max length 3m, gradient 18-90mm, kitchen sink trap seal depth 75mm.
0%
8202-25 drainage (soil pipe)
Kongsikan
oleh
Nkelly7
8202-25 Level 2 Plumbing
Construction
Edit Kandungan
Cetakan
Benamkan
Lebih lagi
Tugasan
Papan mata
Paparkan banyak
Paparkan sedikit
Papan mata ini berciri peribadi pada masa ini. Klik
Kongsikan
untuk menjadikannya umum.
Papan mata ini telah dilumpuhkan oleh pemilik sumber.
Papan mata ini dinyahdayakan kerana pilihan anda berbeza daripada pemilik sumber.
Pilihan untuk Kembali
Gambar rajah berlabel
ialah templat terbuka. Ia tidak menjana skor untuk papan mata.
Log masuk diperlukan
Gaya visual
Fon
Langganan diperlukan
Pilihan
Tukar templat
Paparkan semua
Lebih banyak format akan muncul semasa anda memainkan aktiviti.
Buka keputusan
Salin pautan
Kod QR
Padam
Pulihkan autosimpan:
?