Rollback Plan - Rollback Plan: Develop a rollback plan for reverting changes if issues arise. Include specific steps, tools required, and designated rollback points. Test the rollback plan to ensure its effectiveness before implementing changes. , Sandbox Testing - Sandbox Testing: Use a sandbox environment to test changes in isolation. Mimic production settings to identify potential issues without impacting live systems. , Responsible Staff Member - Responsible Staff Member: Assign a dedicated staff member to oversee the change. Ensure this person coordinates testing, approvals, and implementation. , Request Forms - Request Forms: Use standardized forms to initiate change requests. Include fields for purpose, scope, affected systems, and risk analysis. , Purpose of the Change - Purpose of the Change: Clearly define why the change is being made. Align the purpose with organizational goals or problem resolution. , Scope of the Change - Scope of the Change: Specify what the change entails and what it will not affect. Document any dependencies or constraints. , Date and Time of the Change - Date and Time of the Change: Schedule changes during low-impact periods (e.g., off-peak hours). Allow time for testing and rollback if needed. , Affected Systems/Impact - Affected Systems/Impact: Identify systems, users, and processes impacted by the change. Communicate potential disruptions to stakeholders in advance. , Risk Analysis - Risk Analysis: Assess risks associated with the change, including technical, operational, and business impacts. Categorize the risk level (e.g., Low, Medium, High) to determine mitigation steps. , Risk Level - Risk Level: Low: Minimal impact, easily reversible. Medium: Moderate impact, requires more testing and monitoring. Medium: Moderate impact, requires more testing and monitoring.High: Significant impact, requires extensive testing, approvals, and a detailed rollback plan. , Change Board Approvals - Change Board Approvals: Present the change request to a Change Advisory Board (CAB) for review. Ensure the board evaluates the change based on risk, impact, and alignment with organizational objectives. Document the approval or rejection decision. , End-User Acceptance - End-User Acceptance: Involve end-users in testing to confirm functionality and usability. Gather feedback to identify and address potential issues before deployment. ,
0%
a+1102 4.2 Explain basic change-management best practices
Kongsikan
oleh
Thedrizzzle86
Higher Education
Computing
information technology
Edit Kandungan
Benamkan
Lebih lagi
Tugasan
Papan mata
Paparkan banyak
Paparkan sedikit
Papan mata ini berciri peribadi pada masa ini. Klik
Kongsikan
untuk menjadikannya umum.
Papan mata ini telah dilumpuhkan oleh pemilik sumber.
Papan mata ini dinyahdayakan kerana pilihan anda berbeza daripada pemilik sumber.
Pilihan untuk Kembali
Padankan
ialah templat terbuka. Ia tidak menjana skor untuk papan mata.
Log masuk diperlukan
Gaya visual
Fon
Langganan diperlukan
Pilihan
Tukar templat
Paparkan semua
Lebih banyak format akan muncul semasa anda memainkan aktiviti.
Buka keputusan
Salin pautan
Kod QR
Padam
Pulihkan autosimpan:
?